ClimaLoop | PoA CPA-1 Oti Kumasi Landfill gas Ghana | ClimaLoop
7728
single,single-portfolio_page,postid-7728,ajax_fade,page_not_loaded,smooth_scroll,,wpb-js-composer js-comp-ver-4.1.2,vc_responsive
 

PoA CPA-1 Oti Kumasi Landfill gas Ghana

About This Project

The objective of the “PoA-CPA-1: Oti Landfill at Kumasi (Ghana)”  is to capture the landfill gas (LFG) produced in the landfill and to flare and/or utilize it leading to GHG emissions reductions which contribute to climate change mitigation.  ClimaLoop has conducted the CDM Validation through the CDM Pre-Registration Services covering from the preparation of the Project Design Document (PDD) to the successful Registration of the CDM Project.

 

Methodology

ACM0001

Amount of reductions

38.568 tonnes C02/year

Service offered

CDM Validation for Registration

Category

CDM Pre-Registration Services, Ghana, Landfill gas